Time to change to summer knitting
May. 9th, 2009 04:29 pm![[personal profile]](https://www.dreamwidth.org/img/silk/identity/user.png)
It's in the 80 (Fahrenheit) today, so I need to start prioritizing my summer knitting and organize the yarn for the various projects.
I have two scarves to finish and four different pairs of cotton blend socks and a bamboo shawl project to start:
Steve's Muffler -- just one more ball to finish the scarf
Red Tunisian Ascot -- rip it out and start over with a larger hook, and possibly another repeat of the pattern.
Lost Points shawl with SWTC Melody and Bamboo
Hydrangea socks in Patons Stretch
Plain socks in Regia Cotton Tip & Top
Koi in Regia Cotton Java
Chevron in Regia Cotton Surf with a V-heel instead of the 'forethought' heel. It won't look as nifty, but it will fit better.
This is still unlikely to keep me busy during the entire summer, which stretches from mid-May to mid-September at the least.
I have two scarves to finish and four different pairs of cotton blend socks and a bamboo shawl project to start:
Steve's Muffler -- just one more ball to finish the scarf
Red Tunisian Ascot -- rip it out and start over with a larger hook, and possibly another repeat of the pattern.
Lost Points shawl with SWTC Melody and Bamboo
Hydrangea socks in Patons Stretch
Plain socks in Regia Cotton Tip & Top
Koi in Regia Cotton Java
Chevron in Regia Cotton Surf with a V-heel instead of the 'forethought' heel. It won't look as nifty, but it will fit better.
This is still unlikely to keep me busy during the entire summer, which stretches from mid-May to mid-September at the least.